Killeigh Parish

Search
This Website was last updated:- Oct 24 2015.

Go to content

Re-building in pictures

Local News > Ballinagar Church

St. Joseph’s Ballinagar -- -- Burned 12 Feb. 2004.
Photographic record of restoration begun 5th April 2005.


Barry & Fr John place relics in altar

On Tuesday 21st March, the pupils of 6th Class in Ballinagar school,
placed their projects on Ballinagar, its school, and its new school in a 'Time Capsule' which already contained paper cuttings of the fire, a diary of parish meetings and planning for the 'new church', a copy of the 'Fundraising Project Document', and a 'pre-print' copy of the booklet for Opening Day.
6th Class, with Mr Denis O'Connor, their teacher; Fr Stapleton P.P., The design team [Jackie, J.J., and Mark]; with Joe, Vincent and Ollie at placing of the time capsule in St Joseph's.



Joe Brophy, builder [white hat] and Vincent Cummins, foreman [red hat] oversee the deposit.


FullscreenBackPlayNext

These are the windows from the sanctuary area of St Josephs. On the left is the window that will be over the Baptism font on the Left side of the church, with the Spirit on the top of the window, and the River of Life flowing around the Cross of Life on the right side, and the flames of the Spirit on the left. The 8 circles at the top left represents Regeneration or New Life.
On the Right is the Eucharist Window. We have the Chalice and Host in the top of the window, with the Vine and Grape wrapped around the Living Cross, and the Wheat growing in the right side of the window. Again the eight circles represent Regeneration, or New Life. The three circles represent The Blessed Trinity.


The other windows, eight in all, also have designs, reflecting some of these images.


Artist:- Ann Smyth, CWS Design, Lisburn. Co. Antrim

Test
Removing rubble  ..7th April 200514 April 05 removing remains of altar13.4.05 removing floor of 1930.20.4.05  Floor CleaningThe tower is prepared for examination and for new luvers.The inside of the church is scaffolded to roof level.New Entrance at rear of sacristy, and two new windows.The cleaned and re-pointed tower 11.6.0511th June. New RoofSlating is starting 17th June20th June23rd Sept23rd Sept ...  back doors.Vincent and Ollie with New Confessional and doorway to Gallery staircase behind them.Walls being plastered. 5th Jan 2006New rear Door inspected by Vincent [Foreman] and Ollie [Carpenter]Painting has startedGroundwork supervised by VincentNew entranceInstalling first of new windows [as illustrated above] This is how it looked inside 24th March 2006

Home Page | Parish Newsletter | Parish Calendar | Local Services | EMIGRANT ADVICE | Cemetery Stones | Local News | Mass Times | Safeguarding | Getting Married | YouTube Pieces | Sports Clubs | Useful Links | Diocesan News | History & Heritage | Site Map


Sub-Menu:


Back to content | Back to main menu